Friday, January 30, 2009

The motor and controller should be in in the next couple days. I am now trying to figure out what I am going to do with the complete lack of body work on my bike. I have a few options thus far. Find the original Ninja body parts, make new parts or a combination and do a Street fighter conversion.

Saturday, January 24, 2009

Pulled the bike out


So I have not worked on my bike for time as you can see from the snow build up around it. An Etek motor is on its way along with an Altrax controller. The bike will now be a 48v system as it is far easier to get parts for. I pulled it out of the snow and hope to get it into a warmer work space within the week.